INDUSTRIAL BRIDGE & GANTRY FABRICATION

Location
Chandigarh, Punjab
Year
2023
Duration
20 Weeks
Project Value
₹3.1 Crore

Fabrication and installation of a heavy-duty overhead crane gantry system and connecting pedestrian bridge across an active logistics hub. Designed for 50T crane loads with future rail integration provision.

Structural SteelCertified WeldingLaser Cutting
Total Span
280 m
Crane Capacity
2 × 50T EOT
Steel Grade
IS 2062 E350
Total Steel
320 MT
Bolt Grade
HSFG Grade 8.8
Load Test
110% SWL — Passed
01The Challenge

The structure spanned an active road and required zero traffic interruption. Installation had to be executed in a single overnight window per span using a coordinated crane lift sequence.

02Our Solution

All gantry sections were pre-assembled and pre-tested in our yard before transport. Lift plans were engineered for simultaneous 4-crane operations. All bolted connections were pre-torqued and validated before going to site.

03The Result

All 4 installation phases completed within planned overnight windows. Road never closed for more than 6 hours. Gantry load-tested to 110% rated capacity with zero deflection exceedance.

Project Gallery
Industrial Bridge & Gantry Fabrication gallery 1
Industrial Bridge & Gantry Fabrication gallery 2
Industrial Bridge & Gantry Fabrication gallery 3
Start Your Project

HAVE A SIMILAR STEEL STRUCTURE REQUIREMENT?

We've delivered projects like this across India. Tell us about your steel structure project and we'll respond with a detailed assessment within 48 business hours.